![CMC5-800x400](https://sis-carolinas.com/wp-content/uploads/2015/04/CMC5-800x400-800x400.jpg)
![CMC1-800x400](https://sis-carolinas.com/wp-content/uploads/2015/04/CMC1-800x400-800x400.jpg)
Project Description
Client: Carolinas Medical Center
Location: Huntersville, NC
Size: 120,000 sf
This project consisted of new construction of campus plant facility totaling 120,000 sf. The facility included a state of the art emergency power system housing 4 in-line generators capable of immediate start – load determination, and proper adjustment to serve the entire main campus of the hospital. SIS constructed the metal stud exterior framing and interior framing with acoustical ceilings.